COMMERCIAL TENANT BUILDING PERMIT
SUBMITTAL REQUIREMENTS
CONSTRUCTION PLANS AND DOCUMENTS:
A Construction Design Release issued by the Indiana Department of Homeland Security, Division of Fire Safety/Plan
Review for the applicable project.
Construction Plans that are identical to those released for Construction by the Indiana Department of Homeland
Security, Division of Fire Safety/Plan Review showing the foundation, floor plan, architectural, structural, mechanical,
electrical, and plumbing, including the wall cross sections and details.
Location maps specifically identifying the location of the tenant improvement within the building and an area map
of the overall development.
UTILITY - USAGE CALCULATION SUBMITTAL
Set of Sewer and Water Usage Calculations, submitted in gallons per day and the basis for the calculations,
submitted by the project design engineer. Unless otherwise noted: the State of Indiana Board of Health guide for
estimating wastewater flows will be used for (but not limited) to the type of establishments noted in the guide’s
chart.
SUBMITTAL PROCEDURE
All construction plans and documents shall be submitted in hard copy and digital pdf or ACAD format at Town Hall. (3)
hard copies are required; (1) full size and (2) 11x17 size. The building permit application and plan submittals for a building
permit must be made by the General Contractor, an Agent representing the contractor, or the Person responsible for the
construction.
1. Complete the application.
i. Submittals must be a clear and understandable set of digital detailed plans and
specifications drawn to scale which indicate in a precise manner the nature and location of
all work to be accomplished. Incomplete submittals will not be accepted.
2. Once the application, with the construction plans and documents, is accepted we will begin the review
process. Review time is based upon current workload.
3. When released for construction, you will be notified that the permit is awaiting payment.
i. Permit and Utility Fees are due prior to permit issuance.
ii. Permits may be paid at Town Hall.
4. Once all payments have been received, you will be required to print the permit placard that must be
posted on the site until a Certificate of Occupancy has been issued.